As cities continue to develop and their populations grow, waste disposal has become an important issue. As an efficient and environmentally friendly garbage disposal method, Isuzu garbage compactor vehicle has been widely used in cities. As an advanced automation control technology, PLC control system plays a key role in the control of garbage compactor vehicle. This article will introduce how to set up its PLC control system.
1. Working principle of Isuzu garbage disposal truck
The working principle of the garbage disposal truck is to compress the garbage to reduce its volume and improve the efficiency of garbage transportation. It usually consists of compression device, conveying system, control system, etc. The control system is responsible for controlling the work of each component of the compressed garbage truck to ensure the normal operation of the garbage disposal truck.
2. The setting process of PLC control system
1). Determine the control objects: First determine the objects that need to be controlled, that is, each component of the waste removal truck. Common control objects include compression devices, conveyor belts, etc.
2). Design control logic: Design the corresponding control program based on the working principle and requirements of the waste removal truck. For example, when the garbage is loaded to a certain level, the control system should automatically start the compression device; when the compression device is working, the loading of garbage should be stopped, etc.
3). Write PLC program: According to the designed control logic, write the corresponding PLC program. Commonly used PLC programming languages include Ladder Diagram, Structured Text, etc. When writing a PLC program, you need to consider the input signals, output signals and corresponding logical relationships of the control objects.
4). Connect hardware equipment: Connect the PLC to each component of the waste collection truck. It should be noted that different components may require different sensors, actuators and other equipment, so the compatibility of hardware devices must be ensured during the connection process.
5). Compile and download the program: Compile the written PLC program into an executable file, and download it into the PLC memory through the programming software.
6). Debugging and testing: After the PLC control system setting is completed, debug and test the Isuzu waste collection truck. By simulating various working scenarios, check whether the response and output of the PLC control system are as expected. If there are any problems, troubleshoot and correct them in a timely manner.
3. Precautions for setting up PLC control system
1). System reliability: When setting up the PLC control system, ensure that the compactor trash truck is stable and reliable. Add backup equipment to prevent a single point of failure from bringing down the entire system.
2). Security: In the control system settings, security must be considered. For example, add an emergency stop signal to the PLC program to prevent accidents in emergency situations.
3). Scalability: With the continuous advancement of technology and changes in needs, the control system of Isuzu compactor trash truck also needs to be continuously upgraded and expanded.
The setting up of the PLC control system in the Isuzu garbage compactor vehicle is a complex and critical task. By properly designing, writing and connecting hardware devices, their efficient operation and control can be achieved. During the setup process, attention should be paid to factors such as system reliability, safety and scalability of the waste collection truck to ensure the normal operation of the PLC control system.